{"id":24909,"date":"2026-05-11T13:14:42","date_gmt":"2026-05-11T10:14:42","guid":{"rendered":"https:\/\/poshuk.info\/?p=24909"},"modified":"2026-05-11T16:47:17","modified_gmt":"2026-05-11T13:47:17","slug":"all-stages-of-obtaining-a-construction-license-guide-for-developers","status":"publish","type":"post","link":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/","title":{"rendered":"All Stages of Obtaining a Construction License: Guide for Developers"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A construction license is one of the key permitting instruments for companies planning to perform construction, installation, road, engineering or general contracting works on facilities with an increased level of responsibility. For a developer, it is not a formality, but confirmation that the contractor has the right to work on facilities of the relevant consequence class, has personnel, material and technical resources, experience and an organizational structure for safe performance of works.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the same time, in 2026 this topic should be considered very carefully. The Law of Ukraine \u00abOn Licensing of Types of Economic Activity\u00bb classifies construction of facilities with medium \u00abCC2\u00bb and significant \u00abCC3\u00bb consequences as licensed activities according to the list of works determined by the Cabinet of Ministers of Ukraine. However, during martial law, DIAM separately explains that the right to conduct economic activity may be acquired by submitting a declaration, which currently replaces the construction license.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"950\" height=\"518\" src=\"https:\/\/poshuk.info\/wp-content\/uploads\/2026\/05\/zabudovnyk-inzhener-yuryst.jpg\" alt=\"a developer, engineer and lawyer checking project documentation at a construction site, with a crane, helmets and a tablet displaying an open register in the background\" class=\"wp-image-24891\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">What is a construction license<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A construction license is the right of a business entity to perform certain types of construction works on facilities belonging to the relevant consequence class. In practice, this term often refers to three different things: a classic construction license, a previously issued license recorded in the Register of Construction Activity, or a declaration on conducting economic activity under martial law.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For a developer, it is important to distinguish between these documents because they have different legal meanings:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 a license for construction activity confirms the company\u2019s right to perform licensed construction works;<br>\u2013 a declaration during martial law may temporarily replace the license;<br>\u2013 a permit for construction works applies to a specific facility, not to the entire activity of the company;<br>\u2013 a notification on the commencement of construction works is mainly used for CC1 facilities;<br>\u2013 a certificate or declaration of readiness is required after construction is completed;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is why the search query \u00abconstruction license documents\u00bb should be considered more broadly: the developer must prepare not only documents for licensing construction works, but also documents for the specific facility, contractor, land plot, project documentation and commissioning of the facility.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">When a construction license is required<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The key criterion is the consequence class of the facility. The Law of Ukraine \u00abOn Regulation of Urban Development Activity\u00bb divides facilities into three groups: minor consequences \u2013 CC1, medium consequences \u2013 CC2, significant consequences \u2013 CC3.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In practice, this means that the higher the potential risk to people, property, infrastructure or public interests, the stricter the requirements for the developer, designer, contractor and permitting procedures.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>CC1 \u2013 These are facilities with minor consequences, for which the notification procedure for starting construction works is usually applied.<\/li>\n\n\n\n<li>CC2 \u2013 These are facilities with medium consequences, for which a construction works permit and proper legal verification of the contractor are required.<\/li>\n\n\n\n<li>CC3 \u2013 These are facilities with significant consequences, where the requirements for documentation, expert review, responsible persons and control are the strictest.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">After determining the consequence class, the developer understands whether a notification is sufficient, whether a permit is required, and whether it is necessary to involve a contractor with a valid license, declaration or confirmed right to perform the relevant works.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"950\" height=\"519\" src=\"https:\/\/poshuk.info\/wp-content\/uploads\/2026\/05\/infohrafika-bud-litsenzii-en.jpg\" alt=\"Infographic: \u00abCC1, CC2, CC3 \u2013 difference for a developer\u00bb. Columns: consequence class, type of facility, procedure for starting works, level of control, risks.\" class=\"wp-image-24910\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">License, declaration and permit \u2013 what is the difference<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The main mistake developers make is assuming that a construction license automatically gives the right to build any facility. In reality, a license or declaration relates to the business entity, while a construction works permit relates to a specific facility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The correct logic is as follows:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>First, the consequence class of the facility is determined.<\/li>\n\n\n\n<li>Then it is checked whether the contractor has the right to perform the required works.<\/li>\n\n\n\n<li>Next, project documentation, expert review and data in the Unified State Electronic System in the Construction Sector are prepared.<\/li>\n\n\n\n<li>After that, a notification or an application for a construction works permit is submitted.<\/li>\n\n\n\n<li>After completion of construction, the facility is accepted for operation.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">For CC2 and CC3 facilities, the right to perform preparatory and construction works arises after obtaining a construction works permit. This is directly provided for by Article 37 of the Law of Ukraine \u00abOn Regulation of Urban Development Activity\u00bb.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Stage 1. Determining the consequence class of the facility<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The first stage is the technical and legal classification of the facility. At this stage, the customer, designer and technical specialists determine whether the future facility belongs to CC1, CC2 or CC3.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To correctly determine the consequence class, several parameters are taken into account:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 the number of people who will permanently or periodically stay at the facility;<br>\u2013 the possible impact of an accident on people outside the facility;<br>\u2013 the amount of potential material damage;<br>\u2013 the social significance of the building or structure;<br>\u2013 the facility\u2019s relation to engineering, transport, industrial or critical infrastructure;<br>\u2013 the complexity of structural, geological and technological solutions;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A mistake at this stage may lead to refusal to issue a permit, cancellation of the right to perform construction works, disputes with supervisory authorities or risks for investors.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Stage 2. Choosing the organizational form \u2013 LLC or sole proprietor<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A construction license for a sole proprietor can theoretically be considered within the general rule on business entities, since DIAM\u2019s explanations regarding the declaration indicate that the information includes the business entity \u2013 a sole proprietor or a legal entity. However, for large-scale works, general contracting, participation in tenders, CC2 and CC3 construction, attracting investors and working with banks, an LLC is more often used.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before starting activity, the developer or contractor should choose a model:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 sole proprietor \u2013 a simpler form for small works, service activities, subcontracting or specialized tasks;<br>\u2013 LLC \u2013 a more convenient form for general contracting, road construction, cooperation with large customers and participation in CC2 and CC3 projects;<br>\u2013 ready-made company \u2013 an option for quickly entering the market if business history, open bank accounts, personnel or an existing license are needed;<br>\u2013 company with a declaration \u2013 a practical scenario during martial law if the declaration is submitted correctly and appears in the relevant lists;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/poshuk.info\/en\/categories\/business-registration\/registration-of-companies-llc\/\" type=\"page\" id=\"8159\">Company registration<\/a> should precede the submission of documents, filing of a declaration or purchase of corporate rights. It is important that activity codes, management structure, director, founders, contact details, places of business activity and staff resources correspond to the actual construction activity.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Stage 3. Preparing corporate documents<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">At this stage, the legal basis for further registration of the right to construction activity is formed. If a company is created from scratch, it is necessary to complete state registration, choose a taxation system, appoint a director, prepare the charter and determine the types of activity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The basic package of corporate documents usually includes:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 an extract from the Unified State Register;<br>\u2013 the charter of the legal entity;<br>\u2013 a decision on company establishment or minutes of the general meeting;<br>\u2013 an order appointing the director;<br>\u2013 information about ultimate beneficial owners;<br>\u2013 tax data and taxation system;<br>\u2013 electronic signature of the director or authorized person;<br>\u2013 contact details and address of the place of business activity;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If a <a href=\"https:\/\/poshuk.info\/en\/nominee-director\/\" type=\"post\" id=\"22132\">nominee director<\/a> is used in the structure, powers, corporate control, agreements, banking services and liability must be formalized especially carefully. A formal director without real management may create risks for the license, declaration, tenders, banking compliance and inspections.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Stage 4. Preparing staff and technical resources<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A license for construction activity or a declaration should not be detached from the real condition of the company. The contractor must confirm that it is capable of performing works safely, professionally and in accordance with construction standards.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For this purpose, it is advisable to prepare an internal evidence base:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 employment agreements or civil law contracts with specialists;<br>\u2013 documents confirming education, qualifications and experience of responsible employees;<br>\u2013 orders appointing responsible persons;<br>\u2013 lease agreements or ownership documents for machinery, equipment and tools;<br>\u2013 occupational safety and industrial safety documents;<br>\u2013 internal regulations on quality control of works;<br>\u2013 insurance agreements, if required for a specific project;<br>\u2013 a portfolio of completed works or confirmation of experience;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This section is especially important for companies planning to perform road construction, installation of engineering networks, works with load-bearing structures, industrial construction or works on CC3 facilities.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Stage 5. Submitting a declaration or formalizing the right to activity<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">During martial law, a declaration on conducting economic activity is a practical tool for many business entities. DIAM states that such a declaration currently replaces the construction license and is submitted free of charge through Diia or in paper form through an Administrative Services Center. The Diia guide also confirms that the declaration may be submitted through the Diia portal or through an Administrative Services Center with subsequent transfer through the portal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The sequence of actions for submitting a declaration is as follows:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Register or prepare the business entity.<\/li>\n\n\n\n<li>Check activity codes, address, manager, contact details and electronic signature.<\/li>\n\n\n\n<li>Determine the type of economic activity to be declared.<\/li>\n\n\n\n<li>Select the permit document or license that the declaration replaces.<\/li>\n\n\n\n<li>Fill out the electronic form in Diia or submit documents through an Administrative Services Center.<\/li>\n\n\n\n<li>Check the availability of information about the submitted declaration.<\/li>\n\n\n\n<li>Keep confirmation of the submitted declaration for customers, tenders and counterparties.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">After submitting the declaration, the company must actually comply with legislative requirements, construction standards, occupational safety rules and conditions for performing works. The declaration does not exempt from liability for false information, poor-quality construction or performance of works without a permit for a specific facility.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Stage 6. Checking a valid license or declaration<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before concluding an agreement with a contractor, the developer must verify the license. This applies not only to new partners, but also to companies claiming to have an old indefinite construction license or a submitted declaration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Verification is carried out through official digital registers:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 in the Register of Construction Activity, the section \u00abConstruction Participants\u00bb should be checked;<br>\u2013 in the \u00abLicensees\u00bb tab, information can be searched by the company identification code;<br>\u2013 the \u00abindefinite\u00bb mark should be displayed in the \u00abLicenses\u00bb block;<br>\u2013 the registers should also be used to check permit documents, project documentation, expert reviews, readiness acts and technical inventory;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">DIAM directly explains that to verify the indefinite status of a license, one must go to the Unified State Electronic System in the Construction Sector portal, select the \u00abConstruction Participants\u00bb section, choose \u00abLicensees\u00bb, enter the company identification code and check the \u00abLicenses\u00bb block. The Register of Construction Activity also contains separate sections for declarative and permit documents, project documentation, expert reviews, readiness acts, licensees and other construction participants.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"950\" height=\"519\" src=\"https:\/\/poshuk.info\/wp-content\/uploads\/2026\/05\/hrafik-typovi-prychyny-en.jpg\" alt=\"Chart: \u00abTypical causes of risks when choosing a contractor\u00bb. Columns: no license or declaration, inappropriate consequence class, errors in the Unified State Register, lack of technical resources, unverified director, lack of experience\" class=\"wp-image-24913\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Stage 7. Obtaining a construction works permit<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Even if the contractor has a license, declaration or licensee status, the developer cannot start construction of a CC2 or CC3 facility without a construction works permit. This is a separate administrative stage that applies to a specific facility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Through Diia, it is possible to submit an application for a permit for facilities with medium and significant consequences. The service page states that submitting the application takes approximately 20 minutes, registration takes 10 days, and the service is free of charge.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The following data and documents are required to obtain a permit:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 registration number of project documentation in the Unified State Electronic System in the Construction Sector;<br>\u2013 documents confirming ownership or use of the land plot, if the relevant data are absent from the State Register of Property Rights;<br>\u2013 information about the construction customer;<br>\u2013 information about the general contractor or contractor;<br>\u2013 data on architectural supervision and technical supervision;<br>\u2013 expert review of project documentation, if mandatory;<br>\u2013 information about the consequence class of the facility;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">After the permit is issued, a record of it appears in the Register of Construction Activity, and the applicant receives an electronic copy of the permit or a refusal. The registration of the permit can be checked through the Unified State Electronic System in the Construction Sector portal in the \u00abRegisters\u00bb section.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Stage 8. Performing works and controlling compliance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">After obtaining the permit, an equally important stage begins \u2013 the actual performance of works. The developer must ensure that the contractor works strictly within the permitted types of works, project documentation, construction standards and approved technical solutions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The construction site must ensure:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 availability of persons responsible for performing works;<br>\u2013 keeping work logs and as-built documentation;<br>\u2013 compliance with occupational safety requirements;<br>\u2013 compliance of materials with project solutions;<br>\u2013 proper architectural and technical supervision;<br>\u2013 recording project changes and timely entering information into the register;<br>\u2013 control of subcontractors and their powers;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The law requires information about the document granting the right to perform construction works, consequence class, facility identifier, customer and contractors to be displayed on a stand at the construction site, except for certain private and utility facilities. This is an important element of transparency for supervision, investors, buyers and neighbors.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Stage 9. Making changes when replacing the contractor or adjusting the project<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Changes often occur during construction: replacement of the general contractor, change of technical supervision, project adjustment, change of customer, update of company data, reorganization or change of director. Such changes must not be ignored.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The most common cases when information must be updated are:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 the general contractor or contractor has changed;<br>\u2013 the person responsible for technical supervision has changed;<br>\u2013 the person responsible for architectural supervision has changed;<br>\u2013 project documentation has been adjusted;<br>\u2013 the construction customer has changed;<br>\u2013 the company name or organizational form has changed;<br>\u2013 the director or authorized representative has changed;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the developer, this is not only a matter of formal procedure, but also investment security. If the old contractor remains in the register while another company actually performs the works, risks arise during inspections, sale of future real estate units, commissioning and court disputes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Stage 10. Acceptance of the facility into operation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Obtaining a license or declaration is only the beginning of the process. The final stage for the developer is acceptance of the facility into operation. For CC2 and CC3 facilities, this is carried out on the basis of a readiness act by issuing a certificate through the state architectural and construction control authorities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The following should be prepared for the final stage:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 act of readiness of the facility for operation;<br>\u2013 as-built documentation;<br>\u2013 technical passport or technical inventory materials;<br>\u2013 results of control geodetic surveying;<br>\u2013 documents confirming compliance with project solutions;<br>\u2013 data on contractors, technical and architectural supervision;<br>\u2013 documents on connection to engineering networks;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">After the facility is put into operation, the developer obtains the legal possibility to register ownership rights, transfer facilities to investors or buyers, and start operating the building or structure.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Buying a company with a construction license \u2013 when it is appropriate<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The query \u00abbuy a company with a construction license\u00bb is popular among developers who want to quickly enter the market, participate in a tender or perform works without a long preparatory stage. This option may be useful, but only after a full legal, tax and register-based check.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before purchase, it is necessary to check:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 whether the company is actually a licensee in the Register of Construction Activity;<br>\u2013 whether there is a mark confirming the indefinite status of the license;<br>\u2013 which specific types of works are covered by the license or declaration;<br>\u2013 whether the company has tax debts;<br>\u2013 whether the company is involved in court disputes;<br>\u2013 whether the director, founders or address have changed suspiciously often;<br>\u2013 whether there is a real staff and technical base;<br>\u2013 whether a nominee director was used to conceal actual control;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Buying a ready-made company may be a faster solution than registering a company from scratch, but it should not replace compliance. The greatest risks are not hidden in the license itself, but in the company\u2019s history, debts, old contracts, tax issues and the reality of its construction experience.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">You can choose and buy a ready-made company with a construction license <a href=\"https:\/\/poshuk.info\/en\/categories\/sale-of-companies\/sale-of-construction-companies\/\" type=\"page\" id=\"8738\">in this section<\/a>.<\/p>\n<\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\">Road construction license<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A road construction license is not required as a separate universal document under this exact name, but as the right to perform the relevant construction works within licensed or declared activity. If the road facility belongs to CC2 or CC3, it is especially important to check the consequence class, project documentation, construction works permit, contractor qualification and compliance of the type of works.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For road and infrastructure projects, the following are especially important:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 experience in performing similar works;<br>\u2013 availability of road machinery or lease agreements;<br>\u2013 specialists in engineering networks, geodesy and technical control;<br>\u2013 quality of materials and laboratory control;<br>\u2013 compliance with state or municipal procurement requirements;<br>\u2013 correct registration of subcontractors;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If a company plans to participate in tenders for roads, bridges, junctions or engineering and transport infrastructure, the phrase \u00abwe have a license\u00bb is not enough. It is necessary to confirm specific types of works, experience, resource base and legal status in the registers.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Typical mistakes of developers<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Most often, problems arise not because of the complexity of the procedure, but because of haste. The developer wants to start works quickly, signs an agreement with an unverified contractor, does not check the Unified State Electronic System in the Construction Sector, confuses a license with a permit or believes that a declaration automatically covers all types of works.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The following mistakes are dangerous:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 starting works without a permit or notification;<br>\u2013 incorrect determination of the consequence class;<br>\u2013 using a contractor without confirmed right to perform works;<br>\u2013 formal declaration without a real staff base;<br>\u2013 buying a company without checking debts and court cases;<br>\u2013 absence of technical or architectural supervision;<br>\u2013 failure to make changes after replacing the contractor;<br>\u2013 performing works not according to the project;<br>\u2013 absence of documents for commissioning the facility;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To avoid these risks, it is necessary to check not one document, but the entire chain: company \u2013 license or declaration \u2013 project \u2013 expert review \u2013 permit \u2013 performance of works \u2013 commissioning.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Practical checklist for a developer<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before starting construction, it is advisable to conduct an internal check. It will help determine whether the project is ready to start, whether documents need to be improved, whether the contractor should be replaced or whether data must be entered into the registers.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Determine the consequence class of the facility \u2013 CC1, CC2 or CC3.<\/li>\n\n\n\n<li>Check ownership or use rights to the land plot.<\/li>\n\n\n\n<li>Prepare urban planning conditions, construction passport or other source documentation.<\/li>\n\n\n\n<li>Register project documentation in the Unified State Electronic System in the Construction Sector.<\/li>\n\n\n\n<li>Conduct expert review of the project, if mandatory.<\/li>\n\n\n\n<li>Check the contractor in the Register of Construction Activity.<\/li>\n\n\n\n<li>Make sure the company has a license, declaration or other proper confirmation of the right to perform works.<\/li>\n\n\n\n<li>Submit a notification for CC1 or an application for a permit for CC2 and CC3.<\/li>\n\n\n\n<li>Organize technical and architectural supervision.<\/li>\n\n\n\n<li>Keep as-built documentation during construction.<\/li>\n\n\n\n<li>Timely make changes when replacing the contractor or adjusting the project.<\/li>\n\n\n\n<li>Prepare documents for acceptance of the facility into operation.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Such a checklist reduces the risk of suspension of works, fines, refusal to issue a certificate, and disputes with buyers or investors.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">You can order professional advice on preparing documents and obtaining a building license from specialized lawyers in this field <a href=\"https:\/\/poshuk.info\/en\/categories\/business-licensing-in-ukraine\/construction-license-in-ukraine\/\" type=\"page\" id=\"24918\">here<\/a>. Submit one request and receive several consultations\/proposals.<\/p>\n<\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently asked questions<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Is a construction license required for CC1?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For CC1, a notification on the commencement of construction works is usually applied. The law provides that the right to perform works on facilities with minor consequences arises after submitting the notification.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Is a license required for CC2 and CC3?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Yes. Ukrainian legislation classifies construction of CC2 and CC3 facilities as a licensed type of economic activity. At the same time, during martial law, DIAM explains the possibility of submitting a declaration that temporarily replaces the construction license.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How to check a contractor\u2019s license?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">You need to go to the Unified State Electronic System in the Construction Sector portal, open the \u00abRegisters\u00bb section, find \u00abConstruction Participants\u00bb, select \u00abLicensees\u00bb and enter the company identification code. This is how DIAM describes the verification of the indefinite status of a license.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can a company with a construction license be purchased?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Yes, but before purchase it is necessary to check the license, declaration, company history, debts, court disputes, directors, beneficiaries, staff base and compliance of the types of works. Buying without verification may create more risks than registering a company from scratch.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can a sole proprietor obtain the right to construction activity?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A sole proprietor may be a business entity, and the declaration may contain data about a sole proprietor or a legal entity. However, for large-scale facilities, general contracting, roads, CC2 and CC3 projects, an LLC is more often used due to the requirements of customers, banks, tenders and partners.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Is a license enough to start construction?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. A license or declaration confirms the company\u2019s right to perform works, but for a specific facility a notification or construction works permit is required. For CC2 and CC3, the permit is issued through Diia and displayed in the Register of Construction Activity.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Obtaining a construction license is not one document, but a complete system of preparing a developer or contractor for lawful performance of works. It includes determining the consequence class, registering a company, preparing staff and technical resources, submitting a declaration or confirming a valid license, checking through the Unified State Electronic System in the Construction Sector, obtaining a construction works permit and properly commissioning the facility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For a developer, the best strategy is not to look for the fastest route, but to build a legally safe one. If the company, director, documents, project, permit and register data are consistent with each other, construction carries significantly fewer risks for investors, buyers, banks, supervisory authorities and the project owner.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A construction license is one of the key permitting instruments for companies planning to perform construction, installation, road, engineering or general contracting works on facilities with an increased level of responsibility. For a developer, it is not a formality, but confirmation that the contractor has the right to work on facilities of the relevant consequence [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":24885,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1954],"tags":[2864,2865],"class_list":["post-24909","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business-licensing","tag-stages-of-obtaining-a-building-license","tag-building-license"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>All stages of obtaining a building license - a guide for developers<\/title>\n<meta name=\"description\" content=\"\u0414\u0435\u0442\u0430\u043b\u044c\u043d\u0438\u0439 \u0433\u0430\u0439\u0434 \u043f\u0440\u043e \u043e\u0444\u043e\u0440\u043c\u043b\u0435\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u043e\u0457 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457 \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456: \u0421\u04211, \u0421\u04212, \u0421\u04213, \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0438, \u0434\u043e\u0437\u0432\u0456\u043b \u043d\u0430 \u0440\u043e\u0431\u043e\u0442\u0438, \u0434\u0435\u043a\u043b\u0430\u0440\u0430\u0446\u0456\u044f, \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u043a\u0430 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457 \u0442\u0430 \u0435\u0442\u0430\u043f\u0438 \u0434\u043b\u044f \u0437\u0430\u0431\u0443\u0434\u043e\u0432\u043d\u0438\u043a\u0456\u0432.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"All stages of obtaining a building license - a guide for developers\" \/>\n<meta property=\"og:description\" content=\"\u0414\u0435\u0442\u0430\u043b\u044c\u043d\u0438\u0439 \u0433\u0430\u0439\u0434 \u043f\u0440\u043e \u043e\u0444\u043e\u0440\u043c\u043b\u0435\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u043e\u0457 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457 \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456: \u0421\u04211, \u0421\u04212, \u0421\u04213, \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0438, \u0434\u043e\u0437\u0432\u0456\u043b \u043d\u0430 \u0440\u043e\u0431\u043e\u0442\u0438, \u0434\u0435\u043a\u043b\u0430\u0440\u0430\u0446\u0456\u044f, \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u043a\u0430 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457 \u0442\u0430 \u0435\u0442\u0430\u043f\u0438 \u0434\u043b\u044f \u0437\u0430\u0431\u0443\u0434\u043e\u0432\u043d\u0438\u043a\u0456\u0432.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/\" \/>\n<meta property=\"og:site_name\" content=\"Poshuk.info\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/poshuk.info\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-11T10:14:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-11T13:47:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/poshuk.info\/wp-content\/uploads\/2026\/05\/etapy-oformlennya-litsenzii-na-budivnytstvo.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"950\" \/>\n\t<meta property=\"og:image:height\" content=\"530\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u0420\u0435\u0434\u0430\u043a\u0446\u0456\u044f \u043f\u043e\u0440\u0442\u0430\u043b\u0443 Poshuk.info\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Poshuk_info\" \/>\n<meta name=\"twitter:site\" content=\"@Poshuk_info\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u0420\u0435\u0434\u0430\u043a\u0446\u0456\u044f \u043f\u043e\u0440\u0442\u0430\u043b\u0443 Poshuk.info\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"20 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/poshuk.info\\\/en\\\/all-stages-of-obtaining-a-construction-license-guide-for-developers\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/poshuk.info\\\/en\\\/all-stages-of-obtaining-a-construction-license-guide-for-developers\\\/\"},\"author\":{\"name\":\"\u0420\u0435\u0434\u0430\u043a\u0446\u0456\u044f \u043f\u043e\u0440\u0442\u0430\u043b\u0443 Poshuk.info\",\"@id\":\"https:\\\/\\\/poshuk.info\\\/#\\\/schema\\\/person\\\/c7e7bdc19e549959a0442270c5ea8b4a\"},\"headline\":\"All Stages of Obtaining a Construction License: Guide for Developers\",\"datePublished\":\"2026-05-11T10:14:42+00:00\",\"dateModified\":\"2026-05-11T13:47:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/poshuk.info\\\/en\\\/all-stages-of-obtaining-a-construction-license-guide-for-developers\\\/\"},\"wordCount\":3525,\"publisher\":{\"@id\":\"https:\\\/\\\/poshuk.info\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/poshuk.info\\\/en\\\/all-stages-of-obtaining-a-construction-license-guide-for-developers\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/poshuk.info\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/etapy-oformlennya-litsenzii-na-budivnytstvo.jpg\",\"keywords\":[\"stages of obtaining a building license\",\"building license\"],\"articleSection\":[\"Business licensing\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/poshuk.info\\\/en\\\/all-stages-of-obtaining-a-construction-license-guide-for-developers\\\/\",\"url\":\"https:\\\/\\\/poshuk.info\\\/en\\\/all-stages-of-obtaining-a-construction-license-guide-for-developers\\\/\",\"name\":\"All stages of obtaining a building license - a guide for developers\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/poshuk.info\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/poshuk.info\\\/en\\\/all-stages-of-obtaining-a-construction-license-guide-for-developers\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/poshuk.info\\\/en\\\/all-stages-of-obtaining-a-construction-license-guide-for-developers\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/poshuk.info\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/etapy-oformlennya-litsenzii-na-budivnytstvo.jpg\",\"datePublished\":\"2026-05-11T10:14:42+00:00\",\"dateModified\":\"2026-05-11T13:47:17+00:00\",\"description\":\"\u0414\u0435\u0442\u0430\u043b\u044c\u043d\u0438\u0439 \u0433\u0430\u0439\u0434 \u043f\u0440\u043e \u043e\u0444\u043e\u0440\u043c\u043b\u0435\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u043e\u0457 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457 \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456: \u0421\u04211, \u0421\u04212, \u0421\u04213, \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0438, \u0434\u043e\u0437\u0432\u0456\u043b \u043d\u0430 \u0440\u043e\u0431\u043e\u0442\u0438, \u0434\u0435\u043a\u043b\u0430\u0440\u0430\u0446\u0456\u044f, \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u043a\u0430 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457 \u0442\u0430 \u0435\u0442\u0430\u043f\u0438 \u0434\u043b\u044f \u0437\u0430\u0431\u0443\u0434\u043e\u0432\u043d\u0438\u043a\u0456\u0432.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/poshuk.info\\\/en\\\/all-stages-of-obtaining-a-construction-license-guide-for-developers\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/poshuk.info\\\/en\\\/all-stages-of-obtaining-a-construction-license-guide-for-developers\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/poshuk.info\\\/en\\\/all-stages-of-obtaining-a-construction-license-guide-for-developers\\\/#primaryimage\",\"url\":\"https:\\\/\\\/poshuk.info\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/etapy-oformlennya-litsenzii-na-budivnytstvo.jpg\",\"contentUrl\":\"https:\\\/\\\/poshuk.info\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/etapy-oformlennya-litsenzii-na-budivnytstvo.jpg\",\"width\":950,\"height\":530,\"caption\":\"\u0412\u0441\u0456 \u0435\u0442\u0430\u043f\u0438 \u043e\u0444\u043e\u0440\u043c\u043b\u0435\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u043e\u0457 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457: \u0433\u0430\u0439\u0434 \u0434\u043b\u044f \u0437\u0430\u0431\u0443\u0434\u043e\u0432\u043d\u0438\u043a\u0456\u0432\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/poshuk.info\\\/en\\\/all-stages-of-obtaining-a-construction-license-guide-for-developers\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043e\u043b\u043e\u0432\u043d\u0430 \u0421\u0442\u043e\u0440\u0456\u043d\u043a\u0430\",\"item\":\"https:\\\/\\\/poshuk.info\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"All Stages of Obtaining a Construction License: Guide for Developers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/poshuk.info\\\/#website\",\"url\":\"https:\\\/\\\/poshuk.info\\\/\",\"name\":\"Poshuk.info\",\"description\":\"Find the best!\",\"publisher\":{\"@id\":\"https:\\\/\\\/poshuk.info\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/poshuk.info\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/poshuk.info\\\/#organization\",\"name\":\"Poshuk.info\",\"url\":\"https:\\\/\\\/poshuk.info\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/poshuk.info\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/poshuk.info\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/poshuk.info\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/logo.png\",\"width\":380,\"height\":300,\"caption\":\"Poshuk.info\"},\"image\":{\"@id\":\"https:\\\/\\\/poshuk.info\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/poshuk.info\",\"https:\\\/\\\/x.com\\\/Poshuk_info\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/poshuk.info\\\/#\\\/schema\\\/person\\\/c7e7bdc19e549959a0442270c5ea8b4a\",\"name\":\"\u0420\u0435\u0434\u0430\u043a\u0446\u0456\u044f \u043f\u043e\u0440\u0442\u0430\u043b\u0443 Poshuk.info\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6ee367dca0781e23bbf2ed62f751c349ff7523b4869f5945085c9397ed4ea678?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6ee367dca0781e23bbf2ed62f751c349ff7523b4869f5945085c9397ed4ea678?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6ee367dca0781e23bbf2ed62f751c349ff7523b4869f5945085c9397ed4ea678?s=96&d=mm&r=g\",\"caption\":\"\u0420\u0435\u0434\u0430\u043a\u0446\u0456\u044f \u043f\u043e\u0440\u0442\u0430\u043b\u0443 Poshuk.info\"},\"sameAs\":[\"https:\\\/poshuk.info\"],\"url\":\"https:\\\/\\\/poshuk.info\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"All stages of obtaining a building license - a guide for developers","description":"\u0414\u0435\u0442\u0430\u043b\u044c\u043d\u0438\u0439 \u0433\u0430\u0439\u0434 \u043f\u0440\u043e \u043e\u0444\u043e\u0440\u043c\u043b\u0435\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u043e\u0457 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457 \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456: \u0421\u04211, \u0421\u04212, \u0421\u04213, \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0438, \u0434\u043e\u0437\u0432\u0456\u043b \u043d\u0430 \u0440\u043e\u0431\u043e\u0442\u0438, \u0434\u0435\u043a\u043b\u0430\u0440\u0430\u0446\u0456\u044f, \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u043a\u0430 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457 \u0442\u0430 \u0435\u0442\u0430\u043f\u0438 \u0434\u043b\u044f \u0437\u0430\u0431\u0443\u0434\u043e\u0432\u043d\u0438\u043a\u0456\u0432.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/","og_locale":"en_US","og_type":"article","og_title":"All stages of obtaining a building license - a guide for developers","og_description":"\u0414\u0435\u0442\u0430\u043b\u044c\u043d\u0438\u0439 \u0433\u0430\u0439\u0434 \u043f\u0440\u043e \u043e\u0444\u043e\u0440\u043c\u043b\u0435\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u043e\u0457 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457 \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456: \u0421\u04211, \u0421\u04212, \u0421\u04213, \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0438, \u0434\u043e\u0437\u0432\u0456\u043b \u043d\u0430 \u0440\u043e\u0431\u043e\u0442\u0438, \u0434\u0435\u043a\u043b\u0430\u0440\u0430\u0446\u0456\u044f, \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u043a\u0430 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457 \u0442\u0430 \u0435\u0442\u0430\u043f\u0438 \u0434\u043b\u044f \u0437\u0430\u0431\u0443\u0434\u043e\u0432\u043d\u0438\u043a\u0456\u0432.","og_url":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/","og_site_name":"Poshuk.info","article_publisher":"https:\/\/www.facebook.com\/poshuk.info","article_published_time":"2026-05-11T10:14:42+00:00","article_modified_time":"2026-05-11T13:47:17+00:00","og_image":[{"width":950,"height":530,"url":"https:\/\/poshuk.info\/wp-content\/uploads\/2026\/05\/etapy-oformlennya-litsenzii-na-budivnytstvo.jpg","type":"image\/jpeg"}],"author":"\u0420\u0435\u0434\u0430\u043a\u0446\u0456\u044f \u043f\u043e\u0440\u0442\u0430\u043b\u0443 Poshuk.info","twitter_card":"summary_large_image","twitter_creator":"@Poshuk_info","twitter_site":"@Poshuk_info","twitter_misc":{"Written by":"\u0420\u0435\u0434\u0430\u043a\u0446\u0456\u044f \u043f\u043e\u0440\u0442\u0430\u043b\u0443 Poshuk.info","Est. reading time":"20 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/#article","isPartOf":{"@id":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/"},"author":{"name":"\u0420\u0435\u0434\u0430\u043a\u0446\u0456\u044f \u043f\u043e\u0440\u0442\u0430\u043b\u0443 Poshuk.info","@id":"https:\/\/poshuk.info\/#\/schema\/person\/c7e7bdc19e549959a0442270c5ea8b4a"},"headline":"All Stages of Obtaining a Construction License: Guide for Developers","datePublished":"2026-05-11T10:14:42+00:00","dateModified":"2026-05-11T13:47:17+00:00","mainEntityOfPage":{"@id":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/"},"wordCount":3525,"publisher":{"@id":"https:\/\/poshuk.info\/#organization"},"image":{"@id":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/#primaryimage"},"thumbnailUrl":"https:\/\/poshuk.info\/wp-content\/uploads\/2026\/05\/etapy-oformlennya-litsenzii-na-budivnytstvo.jpg","keywords":["stages of obtaining a building license","building license"],"articleSection":["Business licensing"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/","url":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/","name":"All stages of obtaining a building license - a guide for developers","isPartOf":{"@id":"https:\/\/poshuk.info\/#website"},"primaryImageOfPage":{"@id":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/#primaryimage"},"image":{"@id":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/#primaryimage"},"thumbnailUrl":"https:\/\/poshuk.info\/wp-content\/uploads\/2026\/05\/etapy-oformlennya-litsenzii-na-budivnytstvo.jpg","datePublished":"2026-05-11T10:14:42+00:00","dateModified":"2026-05-11T13:47:17+00:00","description":"\u0414\u0435\u0442\u0430\u043b\u044c\u043d\u0438\u0439 \u0433\u0430\u0439\u0434 \u043f\u0440\u043e \u043e\u0444\u043e\u0440\u043c\u043b\u0435\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u043e\u0457 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457 \u0432 \u0423\u043a\u0440\u0430\u0457\u043d\u0456: \u0421\u04211, \u0421\u04212, \u0421\u04213, \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0438, \u0434\u043e\u0437\u0432\u0456\u043b \u043d\u0430 \u0440\u043e\u0431\u043e\u0442\u0438, \u0434\u0435\u043a\u043b\u0430\u0440\u0430\u0446\u0456\u044f, \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u043a\u0430 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457 \u0442\u0430 \u0435\u0442\u0430\u043f\u0438 \u0434\u043b\u044f \u0437\u0430\u0431\u0443\u0434\u043e\u0432\u043d\u0438\u043a\u0456\u0432.","breadcrumb":{"@id":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/#primaryimage","url":"https:\/\/poshuk.info\/wp-content\/uploads\/2026\/05\/etapy-oformlennya-litsenzii-na-budivnytstvo.jpg","contentUrl":"https:\/\/poshuk.info\/wp-content\/uploads\/2026\/05\/etapy-oformlennya-litsenzii-na-budivnytstvo.jpg","width":950,"height":530,"caption":"\u0412\u0441\u0456 \u0435\u0442\u0430\u043f\u0438 \u043e\u0444\u043e\u0440\u043c\u043b\u0435\u043d\u043d\u044f \u0431\u0443\u0434\u0456\u0432\u0435\u043b\u044c\u043d\u043e\u0457 \u043b\u0456\u0446\u0435\u043d\u0437\u0456\u0457: \u0433\u0430\u0439\u0434 \u0434\u043b\u044f \u0437\u0430\u0431\u0443\u0434\u043e\u0432\u043d\u0438\u043a\u0456\u0432"},{"@type":"BreadcrumbList","@id":"https:\/\/poshuk.info\/en\/all-stages-of-obtaining-a-construction-license-guide-for-developers\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043e\u043b\u043e\u0432\u043d\u0430 \u0421\u0442\u043e\u0440\u0456\u043d\u043a\u0430","item":"https:\/\/poshuk.info\/en\/"},{"@type":"ListItem","position":2,"name":"All Stages of Obtaining a Construction License: Guide for Developers"}]},{"@type":"WebSite","@id":"https:\/\/poshuk.info\/#website","url":"https:\/\/poshuk.info\/","name":"Poshuk.info","description":"Find the best!","publisher":{"@id":"https:\/\/poshuk.info\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/poshuk.info\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/poshuk.info\/#organization","name":"Poshuk.info","url":"https:\/\/poshuk.info\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/poshuk.info\/#\/schema\/logo\/image\/","url":"https:\/\/poshuk.info\/wp-content\/uploads\/2021\/03\/logo.png","contentUrl":"https:\/\/poshuk.info\/wp-content\/uploads\/2021\/03\/logo.png","width":380,"height":300,"caption":"Poshuk.info"},"image":{"@id":"https:\/\/poshuk.info\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/poshuk.info","https:\/\/x.com\/Poshuk_info"]},{"@type":"Person","@id":"https:\/\/poshuk.info\/#\/schema\/person\/c7e7bdc19e549959a0442270c5ea8b4a","name":"\u0420\u0435\u0434\u0430\u043a\u0446\u0456\u044f \u043f\u043e\u0440\u0442\u0430\u043b\u0443 Poshuk.info","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/6ee367dca0781e23bbf2ed62f751c349ff7523b4869f5945085c9397ed4ea678?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6ee367dca0781e23bbf2ed62f751c349ff7523b4869f5945085c9397ed4ea678?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6ee367dca0781e23bbf2ed62f751c349ff7523b4869f5945085c9397ed4ea678?s=96&d=mm&r=g","caption":"\u0420\u0435\u0434\u0430\u043a\u0446\u0456\u044f \u043f\u043e\u0440\u0442\u0430\u043b\u0443 Poshuk.info"},"sameAs":["https:\/poshuk.info"],"url":"https:\/\/poshuk.info\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/poshuk.info\/en\/wp-json\/wp\/v2\/posts\/24909","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/poshuk.info\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/poshuk.info\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/poshuk.info\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/poshuk.info\/en\/wp-json\/wp\/v2\/comments?post=24909"}],"version-history":[{"count":1,"href":"https:\/\/poshuk.info\/en\/wp-json\/wp\/v2\/posts\/24909\/revisions"}],"predecessor-version":[{"id":24920,"href":"https:\/\/poshuk.info\/en\/wp-json\/wp\/v2\/posts\/24909\/revisions\/24920"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/poshuk.info\/en\/wp-json\/wp\/v2\/media\/24885"}],"wp:attachment":[{"href":"https:\/\/poshuk.info\/en\/wp-json\/wp\/v2\/media?parent=24909"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/poshuk.info\/en\/wp-json\/wp\/v2\/categories?post=24909"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/poshuk.info\/en\/wp-json\/wp\/v2\/tags?post=24909"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}